explain why engineers test machines again and again, and write a test plan for every criterion and constraint of our machine.
Phase 4: Build
Do Now. A new roller coaster is built. Before any rider gets on, workers send empty trains around the track many times. Some even carry sandbags or water-filled dummies.
Why do engineers test a ride so many times before people ride it?
Junior engineers, meet the pros. The people who design rides, machines and circuits test their work over and over. Next week we run our big test. Today we plan it like they do.
One test for each criterion and constraint. A good test plan checks every rule. For each one, say what you will measure, what tool you will use, and what you will keep the same.
| Criterion or constraint | What we will measure or count | Tool | What we keep the same |
|---|---|---|---|
| 4 or more energy transfers | |||
| Bell rings | |||
| Classroom materials only | |||
| Setup in 40 minutes or less |
Worked example 1: the bell test. Jamal’s plan: run the machine 3 times. Count how many times the bell rings. Keep the same starting spot for the marble and do not push it.
Worked example 2: the setup test. Mei’s plan: start with every part in the team bin. Start a timer and stop it when the machine is ready. Use the class clock or a timer. The purpose is to find out whether setup is a failure point before Family Science Night.
Why the evidence matters. Your data will show which criterion is hardest to meet. That is where you put your next fix.
Fill in your team’s test plan table. Then check it with these.
Finish your plan on your own, then compare with your team.
Pick the criterion you think will be hardest to meet. Explain how the evidence from your test will show whether that part needs to improve.
Your test plan is ready, junior engineers. You built, critiqued and revised a real prototype. Next: your 3DX field trip. You will step inside a ride engineers’ workshop in 360 degrees.
Exit ticket: would you rather be a mechanical engineer or an electrician? Name one thing from our machine that connects to that job.
How confident are you that you can I can create a plan that includes different tests for each criterion or constraint.
Materials: the test plan table, timers, rulers, notebooks. Optional: a short, school-approved video of a coaster being test-run.
Setup: after the career spotlight, give teams 12 minutes for the plan. Keep each plan; teams use it in 1.23.
Listen for: plans that test only the bell; confusing a tool (timer) with a measurement (minutes).
Support / stretch: pre-fill the tool column for some teams. Stretch: add a test for a second energy changer. If a family member works in the trades or engineering, invite them for a short Q&A.