break my team’s problem into sub-problems, compare at least three solutions in a weighted decision matrix, and build a simulation that tests how a solution affects a threatened population.
Phase 4: Build
Do Now. “Restore the kelp forest” is too big to solve at once. Break it into at least two smaller problems a team could tackle.
Which is the best example of breaking a big problem into a sub-problem (HS-ETS1-2)?
Engineers, from ideas to a choice. Each team picks three candidate solutions from its Ideate list, defines prioritized criteria and constraints, scores the candidates in a weighted decision matrix, and builds a prototype: a physical model or a simulation.
Worked example 1: a decision matrix for the kelp coast (illustrative scores, 1–5). Weights: effectiveness 0.40, cost 0.20, habitat benefit 0.25, community support 0.15.
| Solution | Effectiveness (0.40) | Cost (0.20) | Habitat (0.25) | Community (0.15) | Total |
|---|---|---|---|---|---|
| Urchin removal by divers | 4 | 2 | 4 | 4 | 3.60 |
| Kelp replanting | 3 | 2 | 3 | 4 | 2.95 |
| Sea otter reintroduction | 4 | 3 | 5 | 2 | 3.75 |
The matrix favors otter reintroduction slightly, but the low community score is a warning: fishing communities may worry about otters eating shellfish. A good team discusses such trade-offs openly rather than hiding them behind a number. The cost column must also consider safety (diver hours), reliability (will it last?) and social and cultural effects.
Worked example 2: a simulation as a prototype (HS-LS4-6). To test urchin removal, Team Malik built the spreadsheet simulation below. The human activity it represents is restoration diving; the biodiversity factor is kelp cover, which supports the threatened abalone and many fish.
Classroom reef simulation (a teaching model, not real values). Start: 10 urchins per m², kelp cover 5%. Each year: (1) divers remove a chosen fraction of urchins; (2) the urchins left grow by 10% (new young settle); (3) if urchins are 2 per m² or fewer, kelp cover rises 15 percentage points (to a maximum of 80%); if more, it falls 20 points (to a minimum of 0). Cost: 1 budget unit per hectare each year for every 10% of urchins removed.
Spreadsheet formula for urchins: =B2*(1-$F$1)*1.1; for kelp: =IF(B3<=2, MIN(80, C2+15), MAX(0, C2-20)).
| Year | Urchins/m² (50% removal) | Kelp % (50%) | Urchins/m² (30% removal) | Kelp % (30%) |
|---|---|---|---|---|
| 0 | 10 | 5 | 10 | 5 |
| 1 | 5.5 | 0 | 7.7 | 0 |
| 2 | 3.0 | 0 | 5.9 | 0 |
| 3 | 1.7 | 15 | 4.6 | 0 |
| 4 | 0.9 | 30 | 3.5 | 0 |
| 5 | 0.5 | 45 | 2.7 | 0 |
| 6 | 2.1 | 0 | ||
| 7 | 1.6 | 15 |
At 50% removal kelp starts returning in year 3, at a cost of 5 units per hectare per year; at 30% it takes until year 7, at 3 units per year. Total cost to first regrowth: 15 units versus 21. The faster plan is also cheaper overall. Inputs a team can change: removal fraction, growth rate, threshold. Every input must be realistic and justified.
Build your matrix and simulation with your team.
Version 1 design.
Write your problem statement and sub-problems, your quantified criteria and constraints, and your decision matrix for three solutions. Explain how your top solution reduces a specific human impact on biodiversity.
Evaluate your top solution's cost, safety and reliability, and one social or cultural impact. Which trade-off worries you most?
Version 1 is ready for critique. Next: a gallery walk, a stress test and version 2.
Exit ticket: which input in your simulation are you least sure is realistic, and how could you check it?
Materials: devices with a spreadsheet, a reef-simulation starter sheet, matrix templates, team Ideate lists.
Data note: the reef simulation rules and matrix scores are a classroom teaching model, not real ecological values. Fire and salinity teams adapt their 2.03 or 2.05 tools.
Listen for: unquantified criteria; inputs chosen to make a favorite win; ignoring social and cultural effects.
Support / stretch: give the two formulas pre-entered. Stretch: add a predator term (sea stars recover and remove 15% of urchins a year from year 3) and compare.