THE VR SCHOOL
  • Schools & Districts
    • License the academy
    • Free program for your students
    • Request a demo
  • Catalog
    • AI & Data
    • Cybersecurity & Web
    • Programming
    • Health Science
    • All Guilds
    • All courses
  • Families
  • Accreditation
  • Log In
  • Request a demo
  • Home
  • Courses

RLP Algebra 1A — Data, Linear Equations and Systems

Curriculum

  • 4 Sections
  • 20 Lessons
  • Lifetime
Expand all sectionsCollapse all sections
  • Unit 1: One-Variable Statistics
    5
    • 1.1
      Seeing the Shape of Data: Dot Plots, Histograms and Box Plots
      50 mins
    • 1.2
      Measuring Center and Variability: Mean, Median and MAD
      50 mins
    • 1.3
      Outliers, Skew and Standard Deviation: Which Summary Tells the Truth?
      50 mins
    • 1.4
      Comparing Groups in Context: Units, Scale and Precision
      100 mins
    • 1.5
      Performance Task — Data Story
      150 mins
  • Unit 2: Linear Equations and Inequalities in One Variable
    5
    • 2.1
      Expressions That Tell a Story: Terms, Factors and Coefficients
      50 mins
    • 2.2
      Solving Linear Equations and Justifying Every Step
      50 mins
    • 2.3
      Where Did It Go Wrong? Inequalities and Rearranged Formulas
      50 mins
    • 2.4
      Absolute Value as Distance: Tolerances and Alarms
      100 mins
    • 2.5
      Performance Task — Transit Fare Model
      150 mins
  • Unit 3: Linear Relationships, Inequalities and Systems in Two Variables
    5
    • 3.1
      A Line Is a Set of Solutions: Equations in Two Variables
      50 mins
    • 3.2
      Solving Systems: Graphing, Substitution and Elimination
      50 mins
    • 3.3
      Why Elimination Works: A Proof About Systems
      50 mins
    • 3.4
      Constraints and Half-Planes: Systems of Linear Inequalities
      100 mins
    • 3.5
      Performance Task — Community Planning Proposal
      150 mins
  • Unit 4: Two-Variable Statistics
    5
    • 4.1
      Two-Way Tables: Is There an Association?
      50 mins
    • 4.2
      Scatter Plots and Lines of Fit
      50 mins
    • 4.3
      Residuals and Correlation: How Good Is the Fit?
      50 mins
    • 4.4
      Correlation Is Not Causation: Screens, Sleep and Hidden Variables
      100 mins
    • 4.5
      Performance Task — Bivariate Data Study
      150 mins

Performance Task — Community Planning Proposal

Unit 3  ·  Culminating Performance Task  ·  Lesson 15 of 20

Performance Task — Community Planning Proposal

A1.CED.A.3RLP-ALG1A
Students arrange garden-bed models within limits beside a blank feasible-region sketch and planning tools.
By the end of this lesson I can…

model a real planning problem with a system of linear inequalities, find and interpret the feasible region and its corners, and argue for a plan in writing and orally.

Instruction

Planning under limits is what city councils, school boards and community groups do every week. This task asks you to do it with mathematics you can show and defend.

A starter scenario (illustrative numbers). A school is building raised garden beds on a 480-square-foot patch with a $1,000 budget. A large bed uses 32 square feet and costs $60; a small bed uses 16 square feet and costs $40. Let x be large beds and y small beds.

  • Space: 32x + 16y ≤ 480, which simplifies to 2x + y ≤ 30.
  • Budget: 60x + 40y ≤ 1000, which simplifies to 3x + 2y ≤ 50.
  • x ≥ 0, y ≥ 0, whole numbers.

Corners by solving systems. The space and budget boundaries cross where 2x + y = 30 and 3x + 2y = 50. From the first, y = 30 − 2x; substituting, 3x + 60 − 4x = 50, so x = 10 and y = 10. The other corners are on the axes: (0, 0), (15, 0) from the space limit, and (0, 25) from the budget limit. Check that each corner satisfies every constraint; for example (0, 25) uses 400 square feet, within the 480 available.

A goal. Suppose a large bed grows about 10 plants and a small bed about 6. Plants = 10x + 6y. At the corners: (15, 0) gives 150, (10, 10) gives 160 and (0, 25) gives 150. The mixed plan of 10 large and 10 small beds grows the most, uses the whole patch and the whole budget. That is typical: the best plan often sits where two constraints meet, because both limits are fully used.

Your version. Choose a real planning problem you care about, in your school or community, or adapt the garden scenario with real prices you look up. You need two decision variables, at least three real constraints (space, money, time, volunteers, supplies), and a stated goal. Good options include a food-drive packing plan, a club event with two ticket types, or a mural with two paint colors.

What to produce. Define variables and units; write each constraint with a sentence saying where its numbers came from; graph the feasible region by hand and with Desmos or GeoGebra; find every corner by solving systems algebraically, with checks; test at least two non-corner options as viable or non-viable; and recommend a plan against your goal, naming what you give up.

The proposal and presentation. Write 600-900 words addressed to the people who would decide, such as a principal, a club board or a city council member. Present in three to four minutes as if at their meeting, and answer one question about what would happen if a constraint changed.

📖 Read for this lesson

The reading opens over the lesson; close it to come back to exactly where you were. The checks below draw on it.

  • The Planning File: Three Constraint Problems, Each With Its Numbers and Their SourcesSLS compilation: Missouri Department of Labor and Industrial Relations youth employment hours and U.S. Department of Labor Fact Sheet #43 (29 CFR 570.35), Missouri minimum wage for 2026, and BLS Average Price Data for August 2026 (rice APU0000701312, flour APU0000701111); retrieved 2026-11-03 · about 5 min

    Three complete planning problems, each with its variables, its sourced constraints, its corners worked out and a goal worth arguing about — including one where the corner you expect is not there.

Formative check

Work through these before moving on. They are not graded — they tell you whether the standard below has landed yet.

+50 XP

In the garden scenario, where do 2x + y = 30 and 3x + 2y = 50 intersect?

Substitute y = 30 − 2x: 3x + 60 − 4x = 50, so x = 10 and y = 10. Check: 30 and 50.
Fill in the blank

At the corner (0, 25), the plan uses square feet of the 480 available and grows plants.

Quick self-check

How confident are you that you can model a planning problem with constraints and defend a plan using the feasible region?

Not yetVery confident

Unit 3 checkpoint

Do this before you start the task. It covers the whole unit and tells you what to review first.

+50 XP

What is the slope of 3x + 12y = 120?

y = 10 − x/4.
Fill in the blank

The y-intercept of 3x + 12y = 120 is (0, ).

Myth or Fact?

Every point on the graph of an equation is a solution of the equation.

The graph is the solution set.
+50 XP

Solve x + y = 200 and 8x + 5y = 1210.

3x = 210.
Fill in the blank

For 3x + 2y = 16 and 5x − 2y = 8, x = and y = .

+50 XP

Elimination on a system gives 0 = −7. The system has…

No pair makes 0 = −7 true.
Myth or Fact?

Replacing one equation by its sum with a multiple of the other can create new solutions.

The step is reversible, so the solution set is unchanged.
+50 XP

Which point satisfies x + y ≤ 20 and 15x + 20y ≥ 240?

150 + 120 = 270 and 16 hours.
+50 XP

The boundary of y > 2x + 1 should be…

Strict inequality.
Fill in the blank

The garden constraints 2x + y ≤ 30 and 3x + 2y ≤ 50 meet at (, ).

Myth or Fact?

A solution of a system must satisfy every equation in it.

Satisfying one is not enough.
+50 XP

Which option breaks the space constraint 2x + y ≤ 30?

2(12) + 8 = 32 > 30.

Submit: Community Planning Proposal (600-900 words with graph and calculations) and presentation

Task: Model a real planning problem with two decision variables and at least three linear constraints, graph the feasible region, find its corners algebraically, test options, and recommend a plan against a stated goal.

Submission workflow

  1. Stage 1 — Plan. The problem, the decision-makers, variable definitions with units, and each constraint with the source of its numbers.
  2. Stage 2 — Peer-reviewed draft. A partner re-solves one corner system and tests one option in every constraint; submit a revision note.
  3. Stage 3 — Revised final. Graphed feasible region, all corners with algebraic solutions and checks, tested options, and the 600-900 word proposal.
  4. Stage 4 — Presentation. Three to four minutes to the class as the decision-making body, live or recorded, with one question on changing a constraint.

How it is scored

CriterionWhat proficient looks like
Constraints (A1.CED.A.3)At least three constraints correctly represent real limits; sources of numbers stated.
Feasible region (A1.REI.C.7 / A1.REI.C.8)Half-planes and boundaries (solid or dashed) correct; region clearly identified.
Corners (A1.REI.B.3)Every corner found by solving systems algebraically, with checks in all constraints.
Viability (A1.CED.A.3, A1.NQ.B.4)Options tested and judged viable or non-viable with the failing constraint named; whole-number or other context limits applied.
Recommendation (MP.4)A plan chosen against a stated goal, with trade-offs explained.
Presentation (MP.1)Clear to a non-specialist audience; answers the constraint-change question with reasoning.

Missouri Learning Standards — Mathematics addressed: A1.CED.A.3, A1.REI.C.7, A1.REI.C.8, A1.REI.B.3, A1.CED.A.2, A1.REI.C.6, A1.NQ.B.4, MP.1, MP.4

Instructional focus: Constraint modeling and decision-making

Reading

The Planning File: Three Constraint Problems, Each With Its Numbers and Their Sources

SLS compilation: Missouri Department of Labor and Industrial Relations youth employment hours and U.S. Department of Labor Fact Sheet #43 (29 CFR 570.35), Missouri minimum wage for 2026, and BLS Average Price Data for August 2026 (rice APU0000701312, flour APU0000701111); retrieved 2026-11-03 · Public domain (U.S. and Missouri government publications); compilation, illustrative rates and worked solutions SLS original

Why this reading. The task asks for a real planning problem with two decision variables, at least three constraints whose numbers you can source, a feasible region, corners found algebraically and a recommendation against a stated goal. Three complete problems are set out below. Each one names where every number came from, and each has its corners worked out so you can check your algebra against an answer rather than against your own first attempt. Use one as it stands, adapt one, or use them as the model for a problem of your own — but whatever you choose, your proposal must say where each number came from.

Problem A — A school week of paid work

Decision variables. x = hours in a cafe in one school week; y = hours tutoring in the same week, for a 15-year-old.

Where the numbers come from. Missouri and federal law (29 CFR 570.35) limit a 14- or 15-year-old to 3 hours on a school day, 8 on a non-school day and 18 hours in a week while school is in session; the 18-hour weekly cap is the one that binds. The cafe pays the Missouri minimum wage of $15.00 an hour for 2026, published by the Missouri Department of Labor and Industrial Relations. The tutoring rate of $20.00 an hour is illustrative: no agency publishes one.

Constraints. x + y ≤ 18; 15x + 20y ≥ 250; y ≤ 6; x ≥ 0; y ≥ 0.

Corners. (8.667, 6), (12, 6), (18, 0), (16.667, 0). The first comes from 15x + 120 = 250; the last from 15x = 250.

A goal to argue about. Minimize total hours worked subject to earning $250. The answer is (8.667, 6), about 14.7 hours; the all-cafe corner (16.667, 0) needs 16.7 hours for the same money. Recommending the first means depending entirely on six tutoring hours that may not materialize, and a good proposal says so.

Problem B — A food drive with a van

Decision variables. x = pounds of rice bought; y = pounds of flour bought.

Where the numbers come from. BLS Average Price Data for August 2026, U.S. city average: rice $1.111 per pound (series APU0000701312), flour $0.548 per pound (APU0000701111). The $300 budget, the 400-pound van limit and the 100-pound minimum of flour are the club’s own decisions, which is a legitimate source as long as the proposal says whose decision each one was.

Constraints. 1.111x + 0.548y ≤ 300 (budget); x + y ≤ 400 (weight the van can carry); y ≥ 100 (the pantry asked for flour); x ≥ 0.

Corners, worked. Budget meets weight: substitute y = 400 − x into 1.111x + 0.548y = 300 to get 0.563x + 219.2 = 300, so x = 80.8 ÷ 0.563 = 143.517 and y = 256.483. Budget meets y = 100: 1.111x = 300 − 54.8 = 245.2, so x = 220.702. The remaining corners are (0, 100) and (0, 400).

Note the corner that is not there. Weight meets y = 100 at (300, 100), which would cost 1.111(300) + 0.548(100) = $388.10 and breaks the budget. Two boundaries crossing does not make a corner of the feasible region; it makes a corner only if the point satisfies every other constraint too.

A goal to argue about. If a pound of rice yields about 10 servings and a pound of flour about 6 (illustrative yields), servings = 10x + 6y. At the corners: (0, 100) gives 600; (0, 400) gives 2,400; (220.702, 100) gives 2,807; (143.517, 256.483) gives 1,435 + 1,539 = 2,974. The best plan uses the whole budget and the whole van, which is where two constraints meet.

Problem C — A weekday creek clean-up

Decision variables. x = hours scheduled for each 14- or 15-year-old volunteer in one school week; y = hours scheduled for each 16- or 17-year-old.

Where the numbers come from. Missouri and federal law again: a 14- or 15-year-old is limited to 18 hours a week while school is in session. No law limits the hours of a 16- or 17-year-old, so the club sets its own limit of 36 hours a week for them, and the proposal must say that this one is the club’s choice. The collection rates — 6 bags an hour for the younger crew, 10 for the older — and the supervisor’s 40 hours are illustrative.

Constraints. x ≤ 18; y ≤ 36; 6x + 10y ≥ 300 (bags needed); x + y ≤ 40 (hours a supervisor can cover); x ≥ 0, y ≥ 0.

Corners. (0, 30) from 10y = 300; (18, 19.2) from 108 + 10y = 300; (18, 22) and (4, 36) on the supervisor line x + y = 40; and (0, 36).

A goal to argue about. Minimizing total scheduled hours picks (0, 30) — use only the older crew. That is the mathematical answer and a poor recommendation for a service club whose purpose includes involving younger members. Say what the model optimizes and what it ignores; this is the clearest case in the file of a feasible region answering a narrower question than the one actually being asked.

Checklist before you graph anything

  • Define both variables with units and a time window. “Hours” is not a variable; “cafe hours in one school week” is.
  • Write each constraint with a sentence naming its source, and mark which ones are legal limits, which are physical, and which are somebody’s choice. A club can change its own budget; it cannot change 29 CFR 570.35.
  • Draw boundaries solid for ≤ and ≥, dashed for strict inequalities, and pick a test point for each one rather than guessing which side shades.
  • Check every candidate corner in every constraint, as Problem B shows.
  • Apply the context limits last: whole bags, quarter hours, whole pounds, no negatives.

Sources: Missouri Department of Labor and Industrial Relations, Youth Employment: Acceptable Work and Hours (labor.mo.gov); U.S. Department of Labor, Wage and Hour Division, Fact Sheet #43: Child Labor Provisions for Nonagricultural Occupations (29 CFR 570.35) (dol.gov); Missouri Department of Labor and Industrial Relations, Minimum Wage (labor.mo.gov); BLS, Average Price Data — Rice, white, long grain, uncooked, per lb. (APU0000701312) (data.bls.gov); BLS, Average Price Data — Flour, white, all purpose, per lb. (APU0000701111) (data.bls.gov)

Up NextComplete & Continue →

Leave a Reply Cancel reply

Constraints and Half-Planes: Systems of Linear Inequalities
Prev
Two-Way Tables: Is There an Association?
Next

© 2026 The VR School | Career content by Wiley | Powered by Sejal Learning Systems.

Join free · Accreditation · Privacy Policy · Terms of Service

Modal title

Main Content