THE VR SCHOOL
  • Schools & Districts
    • License the academy
    • Free program for your students
    • Request a demo
  • Catalog
    • AI & Data
    • Cybersecurity & Web
    • Programming
    • Health Science
    • All Guilds
    • All courses
  • Families
  • Accreditation
  • Log In
  • Request a demo
  • Home
  • Courses

RLP Statistics B — Probability Models and Statistical Inference

Curriculum

  • 4 Sections
  • 20 Lessons
  • 10 Weeks
Expand all sectionsCollapse all sections
  • Unit 1: Continuous Distributions and Sampling Distributions
    5
    • 1.1
      Continuous Random Variables and Density Curves
      50 mins
    • 1.2
      The Normal Distribution
      50 mins
    • 1.3
      When Is a Normal Model Appropriate?
      50 mins
    • 1.4
      Sampling Distributions and the Central Limit Theorem
      50 mins
    • 1.5
      Performance Task — Sampling Distribution Simulation Study
      150 mins
  • Unit 2: Estimating with Confidence
    5
    • 2.1
      Estimating a Proportion with Confidence
      50 mins
    • 2.2
      Confidence Intervals for a Mean
      50 mins
    • 2.3
      What Confidence Means, and What It Does Not
      50 mins
    • 2.4
      Comparing Two Groups with Confidence Intervals
      50 mins
    • 2.5
      Performance Task — Estimation Study
      150 mins
  • Unit 3: Testing Claims: Significance Tests
    5
    • 3.1
      The Logic of a Significance Test
      50 mins
    • 3.2
      t-Tests for Means and Paired Data
      50 mins
    • 3.3
      Errors, Power and Significance in the Real World
      50 mins
    • 3.4
      Two-Sample Tests from Experiments and Observational Data
      50 mins
    • 3.5
      Performance Task — Significance Test Investigation
      150 mins
  • Unit 4: Chi-Square, Regression Inference and the Capstone Study
    5
    • 4.1
      Chi-Square Goodness of Fit
      50 mins
    • 4.2
      Chi-Square Tests for Two-Way Tables
      50 mins
    • 4.3
      Inference for the Slope of a Regression Line
      50 mins
    • 4.4
      Choosing the Right Procedure and Writing It Up
      50 mins
    • 4.5
      Capstone — Full Statistical Inference Study
      200 mins

Performance Task — Estimation Study

Unit 2  ·  Culminating Performance Task  ·  Lesson 10 of 20

Performance Task — Estimation Study

PS.17RLP-STATSB
Random weather-day cards are sampled from a population grid and summarized with dots and uncertainty bars.
By the end of this lesson I can…

estimate population parameters from a random sample with confidence intervals, check conditions, plan sample size, and report the estimates with their limits.

Instruction

The task. Estimate at least one population proportion and one population mean from a random sample, and report what you can and cannot claim.

Route 1: a known population (recommended). Use the 200-day sample hosted in this lesson’s reading (or, if you prefer your own station, a NOAA GHCN-Daily file for a Missouri station over at least 10 years from ncei.noaa.gov). Every day is a case. Draw a simple random sample of days (between 40 and 200) with a random number generator, and estimate, for example, the proportion of days at or above 90°F, the proportion of rainy days, or the mean daily high. Because you have the whole population, you can also check whether your intervals captured the parameters and simulate your method’s capture rate, which a real survey never can.

Route 2: an anonymous survey. With a parent or guardian’s approval, survey a random sample of at least 30 people from a list you can legitimately obtain (for example the members of a club, a congregation or a neighborhood association, with the organization’s permission) on a non-sensitive question (such as hours of sleep on a weeknight, or whether they use public transit), with no names collected. Route 2 has a real unknown parameter, and it will also have real nonresponse. Describe it.

Required analysis.

  1. Define each parameter in words and symbols.
  2. Describe the sampling method exactly, including the tool and seed or procedure.
  3. Check the conditions: random, 10%, and large counts (proportion) or normal/large sample (mean), with a graph of the sample.
  4. Construct 95% intervals by hand and confirm them with technology (spreadsheet CONFIDENCE.T and NORM.S.INV, GeoGebra, CODAP, or Python).
  5. Interpret each interval and the confidence level correctly.
  6. Compute the sample size needed to halve each margin of error, and explain why it is about four times as large.
  7. Route 1: compare with the true parameters and simulate at least 200 intervals to estimate the capture rate. Route 2: report the response rate and discuss nonresponse.
  8. Name at least two errors your margins of error do not cover.

A model paragraph. “A simple random sample of 200 days from St. Louis’s 2000-2024 record contained 66 rainy days, so p̂ = 0.330. The sample is random, 200 is under 10% of 9,132 days, and there are 66 successes and 134 failures, so a one-proportion z-interval is appropriate. We are 95% confident that between 26.5% and 39.5% of days in 2000-2024 had measurable rain. The population value, 31.17%, lies inside the interval. Simulating 10,000 such intervals, 94.5% captured it, consistent with the 95% level.”

The defense. Four minutes: your parameters, one interval with its interpretation, and one limitation. Expect a question such as “what does 95% mean here?” and answer it without the word “probability” applied to the parameter.

📖 Read for this lesson

The reading opens over the lesson; close it to come back to exactly where you were. The checks below draw on it.

  • Two Hundred Days Drawn at Random: The Sample for an Estimation Study, with the Truth to Check It AgainstNOAA NCEI GHCN-Daily, station USW00013994 (St. Louis Lambert International Airport), elements TMAX and PRCP, 2000-2024; simple random sample of 200 days drawn for this course with Python’s random module, seed 5; population parameters computed from the whole record; retrieved 2026-11-10 · about 7 min

    Route 1 without the download: 200 days drawn at random from the St. Louis record with the seed stated, both intervals worked, and the population truths to check them against.

  • Forty Intervals and Where They Landed: A Capture Record from a Known PopulationPopulation: NOAA NCEI GHCN-Daily, station USW00013994 (St. Louis Lambert International Airport), PRCP, 2000-2024, N = 9,132 days; intervals generated for this course with Python’s random module, seed 2026; ACS 2023 broadband figure for Missouri from U.S. Census Bureau table B28002; retrieved 2026-11-10 · about 5 min

    The capture-rate simulation the task requires, already recorded: cite it and compute the standard error of its rate yourself.

Vocabulary in context

  • capture rate — The fraction of intervals from repeated samples that contain the parameter.
  • response rate — The fraction of sampled individuals who actually respond.
  • seed — A starting value that makes a random number generator’s output reproducible.

Formative check

Work through these before moving on. They are not graded — they tell you whether the standard below has landed yet.

+50 XP

Your 95% margin of error for a mean is ±3.6°F with n = 30. About what n would give ±1.8°F?

Margin ∝ 1/√n, so halving it needs four times the sample: about 120.
Myth or Fact?

If your 95% interval did not capture the known population mean, your computation must be wrong.

About 5% of correctly computed 95% intervals miss. A miss is expected occasionally; check your work, but it is not proof of an error.

Stage 1 plan: state your route, define your two parameters in words and symbols, describe your population and sampling procedure (tool and seed), give your sample size with a reason, and list the conditions you will check.

0 words
Quick self-check

How confident are you that you can carry out, interpret and defend an estimation study with honest limits?

Not yetVery confident

Unit 2 checkpoint

Do this before you start the task. It covers the whole unit and tells you what to review first.

Fill in the blank

With 66 rainy days in a sample of 200, p̂ = .

+50 XP

Which is a correct interpretation of a 95% confidence level?

The level describes the method.
Myth or Fact?

Doubling the sample size halves the margin of error.

It divides it by √2; halving needs four times the sample.
Fill in the blank

For a 95% margin of error of ±3 points with p* = 0.5, n = .

+50 XP

A 95% interval for a mean with n = 30 and unknown σ should use…

df = 29.
Myth or Fact?

A margin of error covers bias from nonresponse.

Only random sampling variability.
Fill in the blank

An ACS margin of ±2.0 points (90%) corresponds to a 95% margin of about points.

+50 XP

St. Louis and Springfield temperatures in the same 30 years: which procedure?

Paired by year.
+50 XP

An observational interval for a difference between eras excludes 0. What can you conclude?

Scope: no random assignment.
Myth or Fact?

If two 95% confidence intervals overlap, the difference between the groups cannot be significant.

Use the interval for the difference.
Fill in the blank

A sample of 30 daily highs has x̄ = 61.20 and s = 22.596; the SE is about .

+50 XP

Which condition is NOT required for a one-proportion z-interval?

Normality of the population is not needed for a proportion.

Submit: Estimation Study (1,300-1,600 words) + four-minute defense

Task: Estimate a population proportion and a population mean from a random sample (Route 1: the 200-day random sample of St. Louis days hosted in this lesson’s reading, NOAA GHCN-Daily 2000-2024, retrieved 2026-11-10, with the whole-record parameters printed beside it for the capture check, or a sample you draw yourself from a NOAA daily file; Route 2: an anonymous survey approved by a parent or guardian), with 95% confidence intervals, conditions, sample-size planning and an error analysis. Tools: spreadsheet, CODAP, GeoGebra Probability, or optionally Python in JupyterLite. Hand computation with a printed table is fully acceptable.

Submission workflow

  1. Stage 1 — Plan. Route, parameters, population and frame, sample size and sampling procedure; for Route 2, the questions and the privacy plan (a parent or guardian’s approval required).
  2. Stage 2 — Self-checked draft. Recompute one interval and every condition statement and interpretation yourself from your notes, or ask a parent or guardian to repeat one calculation and read your conditions and interpretations; submit those notes and your revision plan.
  3. Stage 3 — Final report. 1,300-1,600 words with intervals, conditions, interpretations, sample-size plan, capture check or nonresponse analysis, and error discussion.
  4. Stage 4 — Defense. Four minutes, recorded or live for a parent or guardian, answering a question about the meaning of confidence.

How it is scored

CriterionWhat proficient looks like
Intervals (PS.17)Correct z- and t-intervals, computed by hand and confirmed with technology.
Conditions (A2.DS.A.4 / A2.DS.A.5)Random, 10% and shape or count conditions checked with evidence.
Interpretation (A2.DS.A.1)Intervals and confidence level interpreted correctly in context.
Sampling distributions (PS.16)Sample-size plan and the 1/√n relationship explained; capture rate or nonresponse analyzed.
Error analysis (A2.DS.A.7)Nonsampling errors identified and their likely direction discussed.
Communication (MP.4, MP.6)Precise language and units; clear report and defense.

Missouri Learning Standards — Mathematics (data and probability) addressed: A2.DS.A.4, A2.DS.A.5, A2.DS.A.1, A2.DS.A.7, MP.4, MP.6

Extends beyond Missouri Statistics (enrichment): content Missouri places after Statistics

Instructional focus: Original estimation study with confidence intervals and error analysis

Reading

Two Hundred Days Drawn at Random: The Sample for an Estimation Study, with the Truth to Check It Against

NOAA NCEI GHCN-Daily, station USW00013994 (St. Louis Lambert International Airport), elements TMAX and PRCP, 2000-2024; simple random sample of 200 days drawn for this course with Python’s random module, seed 5; population parameters computed from the whole record; retrieved 2026-11-10 · Public domain (works of the United States government), with an SLS original sample and computation

Why this reading. Route 1 of the estimation study asks you to estimate a proportion and a mean from a random sample of 40 to 200 days from a NOAA daily record. This reading is that sample, and it is a full route in its own right: 200 days drawn at random from the St. Louis 2000–2024 record, with the date, the daily high and the precipitation for each, and the population parameters you will need to check your intervals against. Both intervals are worked, so you can see what a finished version looks like before you do your own.

How the sample was drawn

The population is every day from January 1, 2000 to December 31, 2024 at station USW00013994 (St. Louis Lambert International Airport) with both PRCP and TMAX recorded: 9,132 days (none of the 9,132 days lacks either value). The days were numbered 0 to 9131 in date order and 200 were chosen without replacement by random.Random(5).sample(range(9132), 200), then sorted by date for printing. Retrieved 2026-11-10.

Population parameters (from the whole record)

ParameterValue
Proportion of days with measurable rain (PRCP ≥ 0.01), all 9,132 days2,846/9,132 = 0.3117
Mean daily high (TMAX), all 9,132 daysμ = 67.59°F, σ = 20.05°F
Proportion of days with TMAX ≥ 90°F1,260/9,132 = 0.1380

Table 1. The sample: 200 days

TMAX in °F, PRCP in inches. Column groups: days 1–100 on the left, 101–200 on the right.

#DateTMAXPRCP#DateTMAXPRCP
12000-01-30270.031012013-04-09790.00
22000-02-25730.201022013-05-27840.47
32000-03-28560.001032013-07-08940.00
42000-05-28660.001042013-09-17720.03
52000-07-08910.001052013-09-23770.00
62000-08-02900.001062013-09-25830.00
72000-10-23810.001072013-11-15600.00
82000-12-19150.001082013-11-26410.00
92001-01-09350.001092014-01-0620.00
102001-04-20740.001102014-01-25430.00
112001-06-05870.001112014-03-01430.00
122001-06-20800.211122014-03-18600.01
132001-07-16900.001132014-04-02552.53
142001-08-23820.801142014-08-14860.00
152002-02-04310.001152014-11-20400.00
162002-03-06670.001162014-12-28380.00
172002-04-29700.001172014-12-30330.00
182002-07-01940.001182015-02-27200.00
192002-07-221000.091192015-03-08630.00
202002-08-20880.021202015-04-01780.00
212002-10-30470.051212015-04-03610.30
222002-12-03320.001222015-04-14690.00
232002-12-17630.011232015-06-04780.10
242003-03-24790.001242015-06-13900.02
252003-07-05950.001252015-07-03830.00
262003-08-19920.001262015-08-09911.49
272003-12-31560.001272015-09-14830.00
282004-02-02380.641282015-11-30480.12
292004-02-17430.001292015-12-10700.00
302004-07-28840.001302015-12-15490.00
312004-10-13640.031312015-12-30350.00
322004-11-05590.001322016-01-16340.00
332005-01-18320.001332016-01-31680.00
342005-01-28330.051342016-03-14700.14
352005-05-04680.001352016-03-16670.00
362005-09-06890.001362016-04-07610.00
372005-11-09720.001372016-04-20710.22
382005-12-06270.001382016-05-04700.00
392005-12-15430.001392016-06-04830.24
402006-03-23460.001402016-06-22980.00
412006-05-02760.001412016-09-04880.00
422006-05-13540.001422016-09-24920.00
432006-07-13960.741432016-11-18700.21
442006-07-15960.001442016-11-28540.28
452006-07-28960.001452017-01-29380.00
462006-08-25820.061462017-03-10460.00
472006-09-05760.031472017-06-20920.00
482006-09-11810.391482018-02-10280.03
492007-01-13330.291492018-02-18530.00
502007-02-27480.001502018-03-17480.00
512007-03-31710.551512018-04-23600.07
522007-06-10740.001522018-04-28630.00
532007-06-12880.001532018-07-25890.00
542007-06-15930.001542018-08-11890.00
552007-06-20850.001552018-10-15510.02
562007-07-28880.001562018-11-13280.00
572007-08-05970.001572018-12-02560.00
582007-09-26700.011582019-06-03780.00
592007-11-25370.171592019-06-29930.00
602007-12-17380.001602019-12-15280.23
612008-01-05580.001612020-03-05630.00
622008-01-18430.001622020-04-24750.69
632008-01-30300.001632020-04-29630.32
642008-02-12230.001642020-05-05660.27
652008-02-24390.101652020-06-09920.15
662008-03-02780.001662020-09-24760.00
672008-04-15630.001672020-10-05670.00
682008-10-24540.101682020-10-06800.00
692008-10-30730.001692020-11-19750.00
702008-12-02480.001702021-01-15360.11
712009-03-09560.071712021-01-31470.05
722009-04-15630.001722021-03-13580.00
732009-05-08730.671732021-04-10631.06
742009-05-24850.031742021-06-27910.24
752009-08-31730.001752021-07-25900.64
762009-09-20690.951762021-08-02820.00
772010-08-24890.001772021-09-13910.00
782011-01-14380.001782021-10-14770.82
792011-01-22340.001792021-11-23540.00
802011-03-04711.361802022-01-23440.00
812011-03-09490.001812022-02-20660.00
822011-03-23750.001822022-05-25811.01
832011-03-31540.001832022-06-11900.00
842011-04-03900.001842022-07-221010.00
852011-06-17801.121852022-12-27340.00
862011-06-29870.001862023-01-03720.81
872011-11-01750.001872023-02-09530.49
882011-11-18580.001882023-03-30710.05
892012-03-19820.001892023-06-04930.10
902012-04-11570.001902023-07-15890.10
912012-04-14801.301912023-09-29880.00
922012-04-16680.001922023-10-11800.06
932012-05-13770.001932023-11-08840.00
942012-07-15960.001942023-12-07680.00
952012-08-06950.001952024-03-09520.00
962012-12-15650.351962024-05-22760.11
972012-12-22470.001972024-06-14910.00
982013-01-20470.001982024-07-14960.00
992013-03-07460.001992024-08-02870.00
1002013-03-23540.062002024-08-17900.00

The two intervals, worked

Proportion. Rainy days: 66 of 200, p̂ = 0.330. Random: yes, by the stated procedure. 10%: 200 < 913. Large counts: 66 and 134. SE = √(0.330 × 0.670/200) = 0.0332; interval 0.330 ± 1.96(0.0332) = 0.265 to 0.395. The truth, 0.3117, is inside.

Mean. The 200 highs sum to 13,306, so x̄ = 66.53°F; s = 21.060°F. Their distribution:

TMAX0–910–1920–2930–3940–4950–5960–6970–7980–8990–99100–109
Days117202120273635302

Spread over a wide range with its peak in the 70s and 80s, skewed to the cold side, no outlier (the warmest day, 101°F on 2022-07-22, is a real heat day, not an error). With n = 200 the shape condition is comfortably met. SE = 21.060/√200 = 1.4892. df = 199; t* = 1.972 (1.984 at df 100 would be the conservative choice). Margin 2.937. Interval: 63.59 to 69.47°F. The truth, μ = 67.59, is inside.

A second proportion, if you want one with a smaller count. Days at or above 90°F: 32 of 200, p̂ = 0.160. Large counts: 32 successes, so the condition is met. The interval 0.160 ± 1.96√(0.160 × 0.840/200) = 0.109 to 0.211. The truth is 0.1380, inside.

Sample size, and the four-times rule

To halve the mean’s margin of 2.94, you need four times the sample: about 800 days. Check it with the formula, using the population σ as the planning value: n = (1.96 × 20.05/1.468)2 = 717. For the proportion, halving 0.065 to 0.0326 with p* = 0.330: n = (1.96/0.0326)2(0.330)(0.670) = 800. Both are about four times 200, because the margin shrinks as 1/√n.

The capture check and the error analysis

Route 1 asks you to simulate at least 200 intervals to estimate the capture rate. The Lesson 2.1 reading is that simulation, recorded: 40 intervals in full and the totals for 1,000 (950 of 1,000 at 95%). Cite it, and compute the standard error of the simulated capture rate yourself. For the error analysis, name what no margin covers here: the sample is of days at one airport, so it says nothing about the rest of Missouri; the instruments and the airport’s surroundings changed over 25 years; days next to each other are alike (the sample is random, but the population is not a list of independent values); and measuring rain to 0.01 inch has its own error, especially in snow. Say which of these could push your estimate up and which down.

Sources: NOAA NCEI, Daily Summaries (GHCN-Daily) data search (ncei.noaa.gov); NOAA NCEI Access Data Service (the query used here) (ncei.noaa.gov); Python documentation, the random module (docs.python.org)

Reading

Forty Intervals and Where They Landed: A Capture Record from a Known Population

Population: NOAA NCEI GHCN-Daily, station USW00013994 (St. Louis Lambert International Airport), PRCP, 2000-2024, N = 9,132 days; intervals generated for this course with Python’s random module, seed 2026; ACS 2023 broadband figure for Missouri from U.S. Census Bureau table B28002; retrieved 2026-11-10 · SLS original, with public domain NOAA and Census data

Why this reading. The lesson says that about 95% of simulated intervals captured the true proportion, and the lab asks you to build a few hundred such intervals in CODAP. A run you did not see, or a run only you have, is not something you can check. This one is. Forty intervals are printed with every intermediate number, from a stated seed on the stated population, so the arithmetic and the hits can be verified one row at a time; the same code run to 1,000 gives the totals at the end.

The population and the method

Population: the 9,132 days at St. Louis Lambert International Airport, 2000–2024 (NOAA GHCN-Daily PRCP, the same file as Lessons 1.4 and 2.1). A day is rainy if PRCP ≥ 0.01 in. True proportion p = 2,846/9,132 = 0.3117. Each sample: 200 days drawn with random.Random(2026).choices(population, k=200), the 40 samples taken in sequence from that one generator. For each sample, p̂ = x/200, SE = √(p̂(1 − p̂)/200), interval p̂ ± 1.96 SE. The last column reruns the same sample with 1.645.

Record: forty 95% intervals

SampleRainy days xp̂SELowerUpperCaptures 0.3117?90% interval captures?
1610.3050.03260.2410.369yesyes
2530.2650.03120.2040.326yesyes
3580.2900.03210.2270.353yesyes
4560.2800.03170.2180.342yesyes
5470.2350.03000.1760.294nono
6570.2850.03190.2220.348yesyes
7490.2450.03040.1850.305nono
8710.3550.03380.2890.421yesyes
9600.3000.03240.2360.364yesyes
10580.2900.03210.2270.353yesyes
11620.3100.03270.2460.374yesyes
12770.3850.03440.3180.452nono
13680.3400.03350.2740.406yesyes
14710.3550.03380.2890.421yesyes
15640.3200.03300.2550.385yesyes
16560.2800.03170.2180.342yesyes
17650.3250.03310.2600.390yesyes
18650.3250.03310.2600.390yesyes
19660.3300.03320.2650.395yesyes
20520.2600.03100.1990.321yesno
21540.2700.03140.2080.332yesyes
22600.3000.03240.2360.364yesyes
23700.3500.03370.2840.416yesyes
24620.3100.03270.2460.374yesyes
25700.3500.03370.2840.416yesyes
26640.3200.03300.2550.385yesyes
27540.2700.03140.2080.332yesyes
28670.3350.03340.2700.400yesyes
29680.3400.03350.2740.406yesyes
30610.3050.03260.2410.369yesyes
31610.3050.03260.2410.369yesyes
32720.3600.03390.2930.427yesyes
33670.3350.03340.2700.400yesyes
34620.3100.03270.2460.374yesyes
35500.2500.03060.1900.310nono
36620.3100.03270.2460.374yesyes
37680.3400.03350.2740.406yesyes
38600.3000.03240.2360.364yesyes
39560.2800.03170.2180.342yesyes
40620.3100.03270.2460.374yesyes

Check a row. Sample 5 had 47 rainy days: p̂ = 0.235, SE = √(0.235 × 0.765/200) = 0.0300, interval 0.176 to 0.294. Sample 12 had 77: interval 0.318 to 0.452. Both are random samples from one population, and the method is the same for each; the intervals differ because the samples differ. A row that says no was not computed wrongly. The method misses about one time in twenty, and those rows are the times.

Totals. 36 of 40 intervals captured 0.3117 (90.0%); the misses are samples 5, 7, 12, 35. At 90% confidence, 35 of 40 (87.5%). Average width: 0.128 at 95%, 0.107 at 90%, a ratio of 1.645/1.96 = 0.84, as the formula says. Forty is too few to pin down a capture rate: the standard error of a proportion near 0.95 from 40 trials is √(0.95 × 0.05/40) = 0.034, so 90.0% is within about 1.5 standard errors of 95%. Run the same code for 1,000 samples and the totals are 950 of 1,000 at 95% (95.0%) and 895 of 1,000 at 90% (89.5%). The lesson’s run of 10,000 gave 94.5%.

What to notice in the record

The intervals are not all the same width. SE depends on p̂, so a sample with 47 rainy days makes a narrower interval than one with 77. Every miss is a sample whose p̂ was far from p; narrow or wide, the interval is centered on the sample, and that is what fails.

“95% confident” is a statement about the column of yes/no answers, not about any one row. Before you look at the last column, each row has a 95% chance of saying yes. After you look, it says yes or no.

Every sample here passes the large-counts check: the smallest x is 47 and the largest is 77, so successes and failures are both at least 10 in all forty.

For the sample-size question

The open question asks for n at ±4 points with p* = 0.5 and with p* = 0.85. A real planning value for broadband: the Census Bureau’s 2023 American Community Survey estimates that 90.7% of Missouri households have a broadband subscription of some kind (2,319,607 of 2,556,271 households; table B28002; the Lesson 2.3 reading prints it county by county). With p* = 0.907, n = (1.96/0.04)2(0.907)(0.093) = 2,401 × 0.0840 = 201.7, so 202 households. For p* = 0.5 the same margin needs 601, and for p* = 0.85, 307. A good planning value for a proportion far from one half saves a great deal of work; a bad one gives a margin you did not promise.

Sources: NOAA NCEI, Daily Summaries (GHCN-Daily) data search (ncei.noaa.gov); NOAA NCEI Access Data Service (the query used here) (ncei.noaa.gov); Python documentation, the random module (docs.python.org); U.S. Census Bureau, ACS 2023 1-year summary file, table B28002 (www2.census.gov)

Up NextComplete & Continue →

Leave a Reply Cancel reply

Comparing Two Groups with Confidence Intervals
Prev
The Logic of a Significance Test
Next

© 2026 The VR School | Career content by Wiley | Powered by Sejal Learning Systems.

Join free · Accreditation · Privacy Policy · Terms of Service

Modal title

Main Content